Excerpt from the 2006 General Plan (GPU4) - Conservation Element



Use your browser's back button or click here to return to the table.
Download the entire text of the GPU4 Conservation & Open Space Element in pdf format (120kB, requires Adobe Reader).








OS-5.16     Any development project that could potentially disturb a special status species or its critical habitat identified by the County requiring analysis or identified for protection under an adopted Area Plan shall be required to conduct a biological survey of the site. Based on the findings of this report, additional focused surveys for certain species may be required. This report, and any mitigation measures recommended in the report, shall be used as a basis for CEQA documentation for the project except if the County, in the exercise of its independent judgment, requires additional analysis. If sensitive biological resources are found on the site, the project biologist shall recommend measures necessary to reduce impacts to a less than significant level. All feasible measures shall be incorporated as conditions of approval in any permit issued. An ordinance establishing minimum standards for a biological report shall be enacted.